Current consumption
The meter was opened on 2011-10-18, there was 49538 kWh on the meter On 2012-03-28, there was 51231 kWh. We burned 1693 kWh.
DONE
- We have a master kill switch (contactor) for all the power sockets in the space. Only the garage door opener, The Gate and the fridge are allowed to be permanently on.
- More sockets on the 50 wall: this side is done.
- The mill is hooked up.
- Sections 1, 2, 3, 5 and 6 lighting is done.
- Hand-made schematics and plan of the space (legal requirement) ned to be re-done in a clean way once the installation is done.
- Outside sign is hooked up
TODO
- Finish lighting rebuild of section 4
- More power sockets on the 46 wall and some drops from the ceiling !!
- Ambient lights in the lounge area.
- Replace broken tubes
- Install relay board
- Fix the wiring in the storage room in the back: connect all grounds
- Re-do the garage door opener wiring: CAT5 is enough.
Material needed
Donations welcome
- OBO fasteners 16-24mm
- screws+6mm plugs
- junction boxes (preferably the ones with a plate with 5 metal binding posts inside)
- Fluorescent light fixtures (36 or 58W)
- Power sockets: scrounge on the flea market !!
Fuse list
- Mill (3x20A)
- Back office/storage (2x20A)
- Wall 46 front and ceiling drops (2x20A)
- Wall 50 (2x20A)
- Wall 46 back (2x20A)
- (free for the future)
- (free for the future)
- (free for the future)
- Kill switch relay (controlled from circuit 13)
- Main differential Δ300 mA
- Lights, sections 5 and 6 (back) (2x16A)
- Lights, sections 2, 3 and 4 (middle) (2x16A)
- Permanent circuit: network cabinet, fridge, garage door opener and kill switch (2x20A)
- Lights, sections 1, toilet and control circuit for the sign (2x16A)
- Outside sign (2x16A)