Electricity/Moulin 40

From Hackerspace Brussels
Jump to: navigation, search


Electricity/Moulin 40
[[Image:{{{picture}}}|200px]]
What:
Electricity: wiring & lighting
Tagline:
get those electrons moving!
Maintainer(s):
askarel
Archived:



DRAFT: WORK IN PROGRESS

Timeline

October 2012

  • Draft some plans for the new layout

November 2012

First week end results:

  • Fusebox moved
  • Front side nearly fully tubed

The plan (aka what we wish)

  • 1 double power socket every 3 meters (around)
  • 1 network socket for every spot with power socket
  • The mill go all the way to the back
  • All the lights will be controlled by 24VAC teleruptors, push button peppered at strategic places (doors, bar,...)
  • The NOC will be in the basement
  • The electronic lab will be on the first floor, at the front
  • ...

TO DO

  1. Attach a wood panel to the wall DONE !!
  2. Move the fusebox DONE !!
  3. Install tubing for what we already know/have decided DONE !!
  4. Pour concrete on top of the installed tubes for protection DONE !!
  5. Troll about little details
  6. goto 3
  7.  ????
  8. Close holes
  9. Pull wires into tubes
  10. connect everything together
  11. Profit !